Tea Beverage Sterilization and BIB Filling System in Zhejiang, China

Sep 03, 2026 Leave a message

A beverage treatment and bag-in-box filling project shaped by a second-floor installation area with restricted access for large equipment.

Project photos

WPS0

Customer challenge

The intended production area was on the second floor, and the transport route could not accept the sterilizer as one complete unit. The equipment had to be installable before it could be operable.

The customer still needed the sterilizer and bag-in-box filler to work as one practical package, with enough room for operation, maintenance and service.

Engineering response

Shanghai Chase divided the sterilizer into transportable sections. Module sizes, the movement route and the final assembly sequence were considered before installation, allowing the equipment to reach its operating position and be reassembled on site.

The sterilizer and bag-in-box filler were coordinated around product transfer, utilities, operator access and service clearance. The customer's beverage process settings are not published.

Project outcome

The public project record states that the equipment was installed and put into operation.

The sectional arrangement solved the transport and assembly constraint. No throughput or product-performance claim is made beyond the confirmed project record.

Points that shaped the solution

  • Measure the complete transport route, not only the final doorway.
  • Confirm the largest module, lifting method and temporary handling space.
  • Check floor loading, final assembly clearance and maintenance access.
  • Define utilities and product connections before the equipment arrives.

Plan equipment for a restricted site

Share the room layout, transport route, lifting conditions, utilities and service clearances. Site constraints should be part of the equipment design from the start.