Pome fruit processing solutions
Apple and pear processing lines for juice, concentrate, pulp and puree
Apple and pear lines can share fruit receiving, washing, sorting and selected downstream systems. The preparation and extraction route changes with the fruit condition and finished product. Juice normally uses crushing and pressing, while pulp or puree uses pulping and refining. Clarification, evaporation, thermal processing and filling are selected after the product and package are defined.
Choose the route by fruit
Processing steps by product
1
Receiving, washing and sorting
Inspect, clean and sort the fruit before product-specific preparation.
2
Product-specific preparation
Crushing, pressing, pulping and refining are selected around the fruit and finished product.
Cloudy or NFC juice
Preparation → crushing → extraction → separation as required → thermal processing → filling
Clarified juice
Preparation → extraction → product-specific treatment → clarification or filtration → thermal processing → filling
Juice concentrate
Prepared juice stream → evaporation → thermal processing → filling
Pulp or puree
Preparation → pulping → refining → product conditioning as required → thermal processing → filling
Main equipment groups
Fruit receiving and preparation
Receiving, washing, sorting, inspection and material-transfer equipment prepare the fruit for the selected extraction route.
Juice extraction or pulp production
For juice, the line may use a crusher and belt press or another suitable extraction system. For pulp or puree, the line uses pulping and refining equipment selected for the required texture and fibre level.
Product clarification or concentration
Clarification equipment is added only for the required juice specification. An evaporator is added when the project includes concentrate.
Thermal processing, filling and cleaning
The downstream section may include a tubular sterilizer, an aseptic filler, another filler type, line controls and the agreed cleaning scope.
Related apple and pear processing projects
Manufacturing and delivery
Project and manufacturing capability
8,000 m² manufacturing facility
Equipment production, assembly and factory testing.
18+ years of experience
Food-processing equipment design and manufacturing.
50+ patents
Supporting equipment and process-related development.
Projects in 30+ countries
Industrial food-processing equipment and turnkey-line projects in multiple markets.
Lifetime technical support
For delivered equipment and processing lines, subject to the agreed service scope.
Frequently asked questions
Can one line process both apples and pears?
Some receiving, washing and downstream systems may be shared. Fruit preparation, extraction, screening and cleaning still need to be checked for each material and finished product.
What is the difference between a juice route and a pulp or puree route?
A juice route separates liquid from the fruit solids through extraction. A pulp or puree route uses pulping and refining to retain the texture and fibre required by the product specification.
Does every juice line need clarification?
No. Cloudy or NFC juice can retain suspended solids. Clarified juice adds treatment and separation stages to reach the required clarity.
Is evaporation required for every project?
No. Evaporation is added when the product is concentrate or when concentration is part of another defined process. The duty depends on the feed stream and target product.
How should processing capacity be stated?
State the basis clearly. Fresh-fruit input, extracted juice flow, product entering thermal processing and filling output are different figures.
Discuss your apple or pear processing project
Share the fruit variety and condition, target product, capacity basis and required package. Workshop dimensions, storage conditions, utilities and any equipment proposed for reuse help define the process route and supply scope.
Discuss a processing projectDetailed apple and pear processing lines
Compare the product-specific pages below for process flow, equipment modules, product-quality decisions and proposal i





